STEP/DWG/PRT/SAT/IGES/SLDASM/SLDPRT/CATPart Format Etc
Mold lead time
20 days
Product lead time
3-5 days
Tolerance
±0.01mm
MOQ
1 Piece Available As Sample
Cavity
Single Cavity\ Multiple Cavity
Packaging and delivery
Packaging Details
For mold: After assemble and clear mold, we paint anti-rust fog or grease on mold, then cover it with thin film and place it into a stable wooden box. For plastic product: the first thing is to wrap each part up with semi-transparent thin foam and put it into plastic bag, the second step is place them into cartons with thin sponge plates to prevent scratches. Or as per your request.